The addition of stiffening ribs to a frame and the production timeline for a complete frame.
| Identifier | ExFiles\Box 8\10\ 10-page082 | |
| Date | 10th April 1937 | |
| E {Mr Elliott - Chief Engineer} /EV. {Ivan Evernden - coachwork} 1/MN. 10.4.37. 4) Details of any stiffening ribs which we may desire you to add to the vertical faces of the frame cross. These stiffening ribs will be added by tack-welding on this frame but on subsequent frames they would be pressed into the sheet. It was agreed that provided you can go ahead and produce the thicker pressings for the side members this week end, and that we give you the information to enable you to punch the holes, etc. by Monday of next week, April 12, you would be in a position to supply us with a complete frame by the last day of April. Yours faithfully, Per and on behalf of ROLLS-ROYCE LTD., Design Dept. | ||