Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Experimental record sheet for a sequence starter motor detailing tests, faults, repairs, and mileage.

Identifier  ExFiles\Box 64\1\  scan0286
Date  17th March 1927
  
C.
Subsequently C2
ELECTRICAL EXPERIMENTAL RECORD SHEETS.
X. No:- 8620
Sequence Starter motor

Date on. | Location. | Date off. | REMARKS. | Miles reading Start. | Miles reading finish. | Miles covered. | Total miles
23-5-25 | Lab. | 25-5-25 | Recd from shop. For particulars see report PC 94/25-5-25. Brushes N.
25-5-25 | " | 4-6-25 | Test (2) by G.J.
7-7-25 | " | 16-7-25 | Test 2 by S.P.
16-7-25 | " | 18-8-25 | Test 3 by S.P. Motor failed. Tested, and insulation to carcase found to be faulty.
18-8-25 | " | 26-8-25 | Also oil leaked from gear into carcase. Armature drop tested and found to be faulty. (Coils shorting at rear end).
26-8-25 | Shop. | 7-9-25 | Sent for repair. Armature rewound.
7-9-25 | Lab. | 3-10-25 | Recd. from shop. See PC 99/23-9-25. Brushes N. Tests 1+3 (3 on teaser as well), +5 (SP{Mr Spinney})
29-10-25 | " | 31-10-25 | Tested in conjunction with Armito on bench. 47 ft.lbs
31-10-25 | 9 EX. | 12-11-25 | Sent into shop for fitting to a car. | 0 | 20 | 20 | 20
12-11-25 | " | 2-1-26 | Reading taken. Speedometer changed. Speedometer again changed. | 8,261 | 8,877 | 616 | 636
2-1-26 | " | | Reading taken. | 0 | 1,428 | 1,428 | 2,064
2-2-26 | " | 27-2-26 | Reading taken. | | 2,261 | 833 | 2,897
27-2-26 | " | | Taken off as main switch failed but put back immediately. | | 2,895 | 634 | 3,531
7-4-26 | " | 13-7-26 | | | 4034 | 4670 |
13-7-26 | lab | | Removed & returned. to lab | 4759 | 5395 | | 5395
13-7-26 | shop. | 4-3-27 | Used for testing Scheme NO.2. (Preliminary) main winding arranged two series two parallel
4-3-27 | lab | 12-3-27 | and modified gears with 5° spiral
12-3-27 | shop | 17-3-27 | Field winding developed faulty
17-3-27 | lab | | sent to shop for repair. returned and retested. Neutral point checked. (NEW)
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙