Procedure for the bedding and testing of dynamo brushes.

Identifier  ExFiles\Box 165\6\  img037
Date  18th October 1926 guessed
  
Contd. -2-

(1) The initial bedding of the brush shews partial contact reasonably well distributed over the working surface. (Preliminary bedding of brushes.)

(2) The insulation resistance of the machine should be taken and should not be less than 1 megohm.

N.B. For the running tests of the dynamo there must be no armature end play. It may be necessary to insert washers between the temporary driving pulley and the pulley and bearing so as to keep the armature up towards this bearing, i.e. in the position which it will have when fitted on the chassis.

(3) Main bedding of brushes.

The dynamo shall now, starting cold, be run on load at about 1450 r.p.m. charging a 12 volt battery of ample capacity and the condition of the brush bedding observed and improved from time to time, if necessary.

This should continue until the working surface of each brush shews evidence of making contact across the whole thickness of the brush (i.e. in the direction of the commutator circumference at some place for an axial distance not less than .050").

(4) Final bedding of brushes.

With end cover removed the dynamo shall now be run on load at 1600 r.p.m. for 3-1/2 hours charging a battery at an operating voltage between 16 and 17. This should render the brush bedding finally satisfactory.

(5) At the termination of the above run, and after a quick final examination and passing of the brush bedding and commutator condition, observations shall be made of the output of the machine at this same speed of 1600 r.p.m.
  
  