Specifications for distributor, platinum point gap, and contact breaker timing.

Identifier  ExFiles\Box 48\3\  Scan081
Date  11th August 1940
  
-2- Contd.
(5) Distributor :-
Total pitch :- 1.686"
Conductor width :- 1.040"
Brush width :- .170"
Position of brush at break (advanced) :- .16"
" " " " (retarded) :- .60"

(6) Platinum point gap :- .010"
Contact breaker timing :-

[Left Table]
Make. Break.
A. {Mr Adams} +14.5° 92.5°
B. 63.° 141.°

[Right Table]
Retarded. Advanced.
Make. 63° +14°
Break. 142° 93°
Make. 243° 195°
Break. 320° 272°

Range :- 48.5° Make ratio :- .433.