From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Modifying the Phantom III body brackets based on feedback from coachbuilders.
| Identifier | ExFiles\Box 92\1\ scan0328 | |
| Date | 19th January 1937 | |
| To HY.{Tom Haldenby - Plant Engineer} Copy to Dw. Rm.{William Robotham - Chief Engineer} RHC.{R. H. Coverley - Production Engineer} MR.B. Bm/DD. E.A. 304 Re Phantom III Body Brackets. L.A. writes to us as follows:- "We find that in every case Coachbuilders are finding it necessary to fill up the hole in the front body bracket, and to re-drill this hole closer to the chassis frame. We think it would be an advantage if as soon as possible we could send out chassis fitted with the first body bracket having the hole for the holding down bolt drilled 1/8" nearer the chassis frame." Would you kindly arrange for this modification to be introduced as soon as possible without the introduction of any scrap. Ev.{Ivan Evernden - coachwork} | ||
