Standardisation of a disc type damper on the servo suspension bracket to prevent brake thumps.


Identifier  ExFiles\Box 87\5\  scan0072
Date  22th December 1936
  
RR 755B (rOH) 88620 12-8-35 W.H.K. 2x800
COMPLETED 15.3.37.
BENTLEY STANDARDISATION of PARTS.
Date 22.12.36
X No. 251. LhL
Drawing No. N.Sch.4406. 4457
Description of Parts: DISC TYPE DAMPER ON SERVO SUSPENSION BRACKET.
Origin: To give more consistent friction for the prevention of brake thumps.
Report of Experimental Test.
Completed 15,000 miles on 6-B-IV.
" 15,000 " " 21-G-IV.
"? 35,000 " " 22-G-V. {VIENNA}
Reported to be a considerable improvement over the present arrangement and parts were in satisfactory condition at completion of tests.

MATERIAL LABOUR CHARGES TOTAL
£ s. d. {John DeLooze - Company Secretary} £ s. d. {John DeLooze - Company Secretary} £ s. d. {John DeLooze - Company Secretary} £ s. d. {John DeLooze - Company Secretary}
Cost of Old Part 5 8 3 3 5 8 14 7
Cost of New Part 5 5 3 11 6 10 16 2
Nett Increase 1 7

Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /RL 2.3.37.

INITIAL DATE REMARKS
SG. {Arthur F. Sidgreaves - MD} 12-3-37. agreed sg. {Arthur F. Sidgreaves - MD}
WOR. {Arthur Wormald - General Works Manager} Hs. {Lord Ernest Hives - Chair} Agreed Hs. {Lord Ernest Hives - Chair}
C. 8.3.37. Agreed C.
E. {Mr Elliott - Chief Engineer} 7.3.37. Agreed Da. {Bernard Day - Chassis Design} for E. {Mr Elliott - Chief Engineer} (absent).
DA. {Bernard Day - Chassis Design} 7.3.37. Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} 5.3.37. Agreed By. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} 5.3.37. Agreed EP. {G. Eric Platford - Chief Quality Engineer}
SFT. {Mr Swift} 5.3.37. Agreed Sft. {Mr Swift}
MX. {John H Maddocks - Chief Proving Officer} 4.3.37. Agreed Mx. {John H Maddocks - Chief Proving Officer}
HS. {Lord Ernest Hives - Chair} Rm. {William Robotham - Chief Engineer} 3.3.37. Agreed Rm. {William Robotham - Chief Engineer}
RHC. {R. H. Coverley - Production Engineer} 4.3.37. Agreed RHC. {R. H. Coverley - Production Engineer}
STAMP: J.S. 12 MAR 1937
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙