From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Diagram showing the arrangement of apparatus for measuring oil flow through bearings.
Identifier | ExFiles\Box 178\1\ img151 | |
Date | 13th July 1926 | |
ARRANGEMENT OF APPARATUS FOR MEASURING OIL FLOW THROUGH BEARINGS. FIG 4 DRAIN FROM SUMP MEASURING TANK B A OIL FROM RELEASE THERMOMETER START OF TEST LONG PIPE FROM SUCTION SIDE OF PUMP FIG 5 TAKE TIME TO FILL THIS TANK OF GIVEN CAPACITY TEMP 60°C POSN WHEN MEASURING ROLLS-ROYCE LIMITED PRINT ROOM 13 JUL 1926 DERBY. | ||