From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Cost estimation for new tooling for a standardized non-return and relief valve housing on the Phantom III.

Identifier  ExFiles\Box 96\2\  scan0225
Date  19th March 1937
  
PHANTOM III STANDARDIZATION PARTS

Description of Part: Housing of non return and relief valve.
Original: Ball valve seat coming adrift.

Report of Experimental Dept:
Estimated cost of new tools ......... £8. 0. 0.
Could be brought on to production at the 1st. Chassis in "D" Series (without scrap.)
The modified scheme is to braze the loose valve seat into the case and the ball valve is wedged by the end of the loose valve thus avoiding cutting of the oil feed to the end.
The C.25 is housed as a complete unit in the base screw and has run without trouble on EX-12 and also on C.25-XM.

COST TABLE:
MATERIAL LABOUR CHARGES TOTAL
s d s d s d s d
Cost of Old Part 8 9 3 0 4 10 16 7
Cost of New Part 2 10 2 0 3 3 8 1
Decrease 5 11 1 0 1 7 8 6

Signature from Cost Dept. that above is correct. 19.3.37

APPROVALS TABLE:
INITIAL DATE REMARKS
BS{A J. Barnes - Assistant Manager} 23.3.37 Agreed B.S.
WH 24.3.37 Agreed W.H.
E.H. 25.3.37 Agreed E.H.
A.G. 25.3.37 Agreed A.G.
B.V. 26.3.37 Agreed B.V.
P.B. 26.3.37 Agreed P.B.
R.H.C. 26.3.37 Agreed R.H.C.
XM 26.3.37 Agreed
H.S. 26.3.37 Agreed H.S.
  
  