Availability and fitting time for weaker springs for the Phantom III clutch with Thermoid facing.
| Identifier | ExFiles\Box 93\3\ scan0421 | |
| Date | 1st April 1938 | |
| 312 W/S. {Derby Works / Sales} Cx. {Major Len W. Cox - Advertising Manager} from Rm. {William Robotham - Chief Engineer} Rm {William Robotham - Chief Engineer} 4/R.1.4.38. P.III CLUTCH WITH THERMOID FACING. With reference to Cx {Major Len W. Cox - Advertising Manager} 10/KW28.3.38., we shall have weaker springs ready for fitting to clutches in about 10 days' time. We will send a supply of these to N. The minimum time required for fitting will be a day, but it will be better to allow two days. Rm. {William Robotham - Chief Engineer} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
