From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a thermometer with an electrical contact for the chassis.
Identifier | ExFiles\Box 172\1\ img096 | |
Date | 4th January 1927 | |
RR 755 REVISED (10H) (DE444 6-10-26) BM. COMPLETED 15.1.27 STANDARDISATION of CHASSIS PARTS. Date 4.1.27 5250 X No. 3875 Description of Parts. THERMOMETER WITH ELECTRICAL CONTACT. Origin. To prevent shutters of radiator being left in closed position. Experimental Test Report. This has been run 14,000 miles on the Phantom without trouble. Recently seen by Sales on 9-C-111. Road Test Report. This item having been standardised on the Phantom we consider that it is equally necessary on the 20 HP. Drawing No. Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on :- Series.........£......... Series.........£......... Series.........£......... Weight of Old Part. Weight of New Part. Difference per Car. Cost of Old Part. £ 1. 15. 0 Cost of New Part. £ 2. 18. 0 Difference per Car. £ 1. 3. 0 increase. Signature from Cost Dept. that above is correct. My/Rb.{R. Bowen} 6.1.27 INITIAL DATE REMARKS BJ. 14.1.27 Agreed. B.Johnson. R.{Sir Henry Royce} 7.1.27 Agreed FHR WOR.{Arthur Wormald - General Works Manager} 5.1.27 Agreed. Wor.{Arthur Wormald - General Works Manager} RG.{Mr Rowledge} 5.1.27 Agreed. Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} 6.1.27 Agreed. Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} 5.1.27 Agreed. BY.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} 4.1.27 Agreed. EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} 6.1.27 Agreed. E.{Mr Elliott - Chief Engineer} PN.{Mr Northey} 13.1.27 Agreed. PN.{Mr Northey} CWB. 10.1.27 Agreed. CWB. HS.{Lord Ernest Hives - Chair} 4.1.27 Agreed. Hs.{Lord Ernest Hives - Chair} [STAMPED] 20 H.P. CHASSIS | ||