From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Lack of a definite target for body work and the split responsibility between different locations.
Identifier | ExFiles\Box 148\5\ scan0250 | |
Date | 13th December 1937 | |
-5- Rm{William Robotham - Chief Engineer}3/R.13.12.37. Briefly, cannot we have some definite target, however distant, to aim at on body work, so that gradual but continuous organisation can proceed to achieve the required result. At the moment we are planning five years ahead on chassis, but the responsibility for bodies seems to be divided between Derby and London with a horizon about two years distant. In our experience it is difficult enough to get results even when everyone is clear about the objective. Rm.{William Robotham - Chief Engineer} | ||