From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a gearbox with synchromesh 2nd gear.

Identifier  ExFiles\Box 171\2\  img213
Date  7th February 1935
  
RR 755 (BH) (57312, 29-12-33) BM 3/640/2
COMPLETED 16.3.35.
40/50 STANDARDISATION of PARTS.
Date: 7.2.35.
X No. 7310.
Drawing No. H.{Arthur M. Hanbury - Head Complaints} Sch.
Part List:
3964/5/6
3984/5/6/7/8
4016/7/8
4002
3992/8
4140
4170
4173
GL.{G. Linnett}719/716
Description of Parts: GEARBOX WITH SYNCHROMESH 2nd GEAR.
Origin: To facilitate ease of change.
Report of Experimental Test: Fitted to 28-EX and ran 15,000 miles in France. Was considered good during the latter part of the mileage.
Weight of Old Part.
Cost of Old Part: £
Weight of New Part.
Cost of New Part: £ See over
Difference per Car.
Difference per Car: £ 12. 1s. 6d. Increase.
Signature from Cost Dept. that above is correct. G/No. 2.2.35.
Cost of Parts in Works which will be scrapped if commenced on:
Series.........£.......
Series.........£.......
Series.........£.......
INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 16.3.35. | Agreed SG.{Arthur F. Sidgreaves - MD}
WOR.{Arthur Wormald - General Works Manager} | 27.2.35. | Agreed Wor.{Arthur Wormald - General Works Manager} [Handwritten: Copy used]
C. | 11.2.35. | Agreed C.
RG.{Mr Rowledge} | | [Handwritten: Previous forms]
DA.{Bernard Day - Chassis Design} | 7.3.35. | Agreed Da.{Bernard Day - Chassis Design} [Handwritten: Though synchromeshing at any but a low speed is harder than an RR. control should be.]
BY.{R.W. Bailey - Chief Engineer} | 8.2.35. | Agreed By.{R.W. Bailey - Chief Engineer} [Handwritten: The arrangement is a definite advantage on the whole.]
EP.{G. Eric Platford - Chief Quality Engineer} | 11/3/35 | [Handwritten: Already signed about 2 of these - not agreeing. Bound to have complaints for this reason as will be more serious than non synchro mech 2nd top etc. EP{G. Eric Platford - Chief Quality Engineer}]
E.{Mr Elliott - Chief Engineer} | 15.2.35. | Agreed AE.
BN.{W.O. Bentley / Mr Barrington} | 11.2.35. | Agreed Bn.{W.O. Bentley / Mr Barrington}
SFT.{Mr Swift} | 11.2.35. | Agreed Sft.{Mr Swift}
MX.{John H Maddocks - Chief Proving Officer} | 13.2.35. | Agreed MX.{John H Maddocks - Chief Proving Officer} [Handwritten: Not so good as anticipated but apparently meets a demand]
HS.{Lord Ernest Hives - Chair} | 7.2.35. | Agreed Hs.{Lord Ernest Hives - Chair}
  
  