From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts, specifically a friction washer for pivots.
Identifier | ExFiles\Box 171\3\ img213 | |
Date | 4th October 1923 | |
R.R. 75S (10M) (SL 72 18-7-23) MP 274954s. COMPLETED 2.11.23. STANDARDISATION of CHASSIS PARTS. Date 4.10.23. Description of Parts: FRICTION WASHER FOR PIVOTS. Origin: To increase amount of friction. [Box with X mark] No. 4207 Drawing No. Part List Experimental Test Report: At present 40/50 cars have one fibre friction washer in one pivot. It is proposed to fit friction washers to both pivots and change the material from fibre to lead-bronze. Road Test Report: Adopted by Springfield. We have proved that 40/50 chassis when they have been on the road for a time, are improved by slightly more friction in the steering. It has the disadvantage that the customers first impression of a new car is that the steering is heavy. [Action List] A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £ 13/0d. Weight of New Part. Cost of New Part. £ 8/10d. Difference per Car. Difference per Car. £ 4/2d. saving. Cost of Parts in Works which will be scrapped if commenced on:- Series...£... Series...£... Series...£... Signature of Mr. De LOOZE that above is correct. MV/JW 29.10.23. SIGNATURES | DATE | REMARKS MR. JOHNSON | | MR. B. JOHNSON | 1.11.23 | Agreed. BJ. MR. ROYCE | 28/10/23 | Agreed FHR MR. WORMALD | 30.10.23 | Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE | 10.10.23 | Agreed. Rg.{Mr Rowledge} MR. DAY | 11.10.23 | agreed Da{Bernard Day - Chassis Design} MR. BAILEY | 4.10.23 | Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD | 4.10.23 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT | 15-10-23 | Agreed AE MR. NORTHEY | 12.10.23 | Agreed. PN.{Mr Northey} MR. HIVES | 31.10.23 | Agreed. E.Hives. [STAMPED: H.P.D. ORIGINAL] | ||