Drawing for a longer Goshawk 11 front dumb iron, retaining the bolting scheme due to riveting issues.
| Identifier | ExFiles\Box 75\3\ scan0341 | |
| Date | 27th April 1922 | |
| To Da. {Bernard Day - Chassis Design} from E. {Mr Elliott - Chief Engineer} c. to CJ. c. to Wor. {Arthur Wormald - General Works Manager} c. to BY. {R.W. Bailey - Chief Engineer} c. to Hs. {Lord Ernest Hives - Chair} Y4260 E1/M27.4.22. GOSHAWK(Aero Engine)(Codename for 20HP Car / Aero Engine after Kestrel(Aero Engine)) 11. FRONT DUMB IRON. X.4260. We send you herewith drawing No. LeC.1559 shewing a dumb iron 15% longer than LeC.1525, made in accordance with Mr. Royce's memo. R1/M19.4.22. We found it impossible to get 2 rivets into the front end of the dumb iron and have therefore retained the bolting scheme as used on LeC.1525. We are notifying Mr. Royce accordingly. E. {Mr Elliott - Chief Engineer} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).