Cost-saving modification recommendation for the Phantom III 'E' series chassis, reducing tool costs.


Identifier  ExFiles\Box 171\2\  img322
Date  12th August 1931
  
PHANTOM III STANDARDISATION of PARTS

OC X

Date: 12.8.31

Estimated cost of new tools ...... £19.0.0.

Could be brought on to production at the 1st. chassis in 'E' series (without scrap).

By altering Manufacturing Methods of pieces the Tool Cost has been reduced from £19. to £8. This outlay will be recovered after producing 40 chassis due to reduction in Factory Cost of 3/10d. per chassis and therefore recommend that this modification is standardised. RHC. {R. H. Coverley - Production Engineer}

Cost Table:
MATERIAL | LABOUR | CHARGES | TOTAL
s. d. {John DeLooze - Company Secretary} | s. d. {John DeLooze - Company Secretary} | s. d. {John DeLooze - Company Secretary} | s. d. {John DeLooze - Company Secretary}

Approval Table:
INITIAL | DATE | REMARKS
GC
BH | 25.8.31
C | 11.9.31
E | 11.9.31
AG | 11.9.31
YB
EB | 16.9.31
RHC {R. H. Coverley - Production Engineer} | 16.9.31
XM
RM {William Robotham - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙