Dimensional errors and discrepancies on the third frame of a Wraith II chassis.
| Identifier | ExFiles\Box 8\10\ 10-page064 | |
| Date | 10th March 1937 | |
| 627 From HPS. {Horace Percy Smith - Experimental Factory Mgr} c. to RM. {William Robotham - Chief Engineer} S E C R E T. WRAITH II. We are now in receipt of the third frame, and there appears to be some improvement on the first two frames as regards dimensional accuracy. There are, however, one or two discrepancies which should be taken up with the makers, and the following is a list of the various errors which have come to light on marking out for subsequent drilling operations. 1. The inner stiffener at the front end of each channel is out of position .100 rearwards. 2. When the temporary crossmember is removed, forward extremities of channels open out .250. 3. The centre section of the frame, including the cruciform member, is offset .125 from the true centre line towards left hand side. 4. The cruciform member is out of position .125 rearwards. 5. The left hand channel is not upright forward of the cruciform member. 6. The top of the right hand channel is buckled in the vicinity of the dashboard. 7. All plates on cruciform member are -.100 on 9.400 depth. 8. The slot 4.000 long in left hand plate of cruciform member is .250 out of position rearwards. 9. Spring anchor brackets Fw.486/7. are .125 forward of the true position. continued. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).