Rolls-Royce Archives
         « Prev  Box Series  Next »        

Time study sheet for installing bolts and rivets.


Identifier  ExFiles\Box 119\2\  scan0047
Date  30th April 1914 guessed
  
Wor {Arthur Wormald - General Works Manager} /Mcrl/L5514.
Sheet. 3
BOLTS & RIVETS ETC.
3/8" vertical rivet in Dumb Iron, near side. 5 hrs 13 mins. Average over. 1
ditto. off side 10 " 38 " " " 1
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙