Standardisation of steering pivot pins made with a slow taper for fitting to the axle.
Identifier | ExFiles\Box 80\1\ scan0115 | |
Date | 8th November 1920 | |
STANDARDISATION of CHASSIS PARTS. COMPLETED Date: 24.11.20 Description of Parts: X 3Y91a Steering pivot pins made with a slow taper for fitting to axle. Origin: In order that pins can be removed without damaging them. Experimental Test Report: Set run on bump test for 85 hours, no trouble. On repair cars the present pivot pins are sometimes found slack, this should prevent this happening. Road Test Report: Run 12,000 miles on 2EX. Run 3,000 miles on 3EX. No trouble. Top Right Box: Date: 8.11.20. X No. 3Y91a. Drawing No. N.1067. Part List. A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock. Alteration effective on future Chassis. Signature of Exp. Dept. that above is correct: E.{Mr Elliott - Chief Engineer} Hives. Weight of Old Part: --- Cost of Old Part: £ - 10. 8. Weight of New Part: --- Cost of New Part: £ - 11. 4. Difference per Car: --- Difference per Car: £ 0. 0. 8d. increase. Signature of Mr. DeLOOZE that above is correct. Signatures Table: SIGNATURES | DATE | REMARKS Mr. JOHNSON | 19.11.20 | Agreed. B. Johnson. Mr. ROYCE | 22.11.20 | Agreed FHR. Mr. WORMALD | 17.11.20 | Agreed. Wor.{Arthur Wormald - General Works Manager} Mr. BARRINGTON | 09.11.20 | Agreed Bn.{W.O. Bentley / Mr Barrington} Mr. DAY | 11.11.20 | Agreed. Da.{Bernard Day - Chassis Design} Mr. BAILEY | 8.11.20 | Agreed. By.{R.W. Bailey - Chief Engineer} (No scrap should be made to introduce this). EWT for R.R. Inc. Mr. PLATFORD | 9.11.20 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} Mr. NORTHEY | 12.11.20 | Agreed. PN.{Mr Northey} | ||