From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Urging the completion of drawings for new features on the 89th Chassis 'N2' Series due to extreme urgency.
Identifier | ExFiles\Box 65a\3\ scan0313 | |
Date | 10th March 1932 | |
Hs.{Lord Ernest Hives - Chair} E.{Mr Elliott - Chief Engineer} [struck through] RHC.{R. H. Coverley - Production Engineer} [struck through] By.{R.W. Bailey - Chief Engineer} [struck through] WOT. [struck through] [Handwritten] LID{A. J. Lidsey} 8770. [Handwritten] See me [Handwritten] HS{Lord Ernest Hives - Chair} Sft.{Mr Swift} absent. Sft{Mr Swift}/AEM/B.10.3.32. NEW FEATURES ON THE 89TH. CHASSIS 'N2' SERIES. We understand the D.O. have now instructed all the parts in connection with the above with the exception of the Pedals and the Side Spare Wheel Carrier, and upon enquiring from 'E's Department we understand that both of these items are up to the Expl. Department. We should be glad if these could be urged all possible so that we can have the necessary drawings and instructions from the D.O. without delay. Will Hs.{Lord Ernest Hives - Chair} ask for these units to have special attention in view of the extreme urgency of the job. Sft{Mr Swift}/AEM. [Illegible signature] | ||