List of requirements for workshop and test facility equipment such as pits, benches, cranes, and utilities.


Identifier  ExFiles\Box 155\3\  scan0110
Date  21th December 1936 guessed
  
-2-

PIT.

The existing pit should be lengthened by 3' to 4' and widened by approximately 1' particularly the latter for when working with heavy loads present conditions are dangerous.
The floor requires levelling, and rails letting in to accommodate either items 24 and 25 for high speed (flywheel) and heavy torque reversal tests where breakage may prove dangerous.
Inlaid pit light.

BENCHES.

Provision for at least 12 vices, also drawers, and cupboards, with three transportable drawing report desks.

CRANES.

Two cranes each capable of carrying at least 2 tons.

LADDER.

1 off 20 rung ladder.

GAUGES.

2 off 6 ft. mounted manometers to latest test bed pattern.

STORAGE.

As shown on plan, outhouse attached to accommodate tackle not in immediate use, oil reserves, etc., including two single width racks for light articles.
Continuation to accommodate electrical equipment, generators, fuse boards etc. The final section to form ground floor of fuel test house.

WATER, STEAM (SUMMER MAIN) GAS & COMPRESSED AIR.

Present supplies are inadequate and provision must be made for largest possible supply.
Connections for each are required at frequent intervals along the length of the department, and suitable drainage for water and steam also to be provided.

ELECTRIC PLUGS.

Suitable plug points for inspection lamps, drills, and portable flexible drive units at convenient positions.

continued.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙