Standardisation report for main and big end bearing shims made from R.R.56 solid metal, replacing steel shims with Hall's alloy.
| Identifier | ExFiles\Box 115\1\ scan0173 | |
| Date | 26th October 1936 | |
| RR 755B (10H) 88620 12-8-35 W.H.K. 21800 COMPLETED 30.11.36. 9/12/36 BENTLEY STANDARDISATION OF PARTS. Date: 26.10.36 / 28.10.36 X No. 1020 Drawing No. EB.2691/2/3 EB.2488. Description of Parts: MAIN & BIG END BEARING SKIMS MADE IN R.R.56 solid metal. Origin: Bad adhesion and difficulty in production of facing steel shims with Hall's alloy. Report of Experimental Test: 10 hours running at 1/4 load each hour comprising 30 mins. at 4000 R.P.M. 25 mins. at 4250 R.P.M. and 5 mins. at 4800 R.P.M. Under this condition we have not run more than 3 hours without the Hall's metal face coming off in the case of standard shims. MATERIAL £ s. d. {John DeLooze - Company Secretary} Cost of Old Part: 11 4 Cost of New Part: 6 0 LABOUR £ s. d. {John DeLooze - Company Secretary} 6 6 6 CHARGES £ s. d. {John DeLooze - Company Secretary} 9 9 9 TOTAL £ s. d. {John DeLooze - Company Secretary} 1 7 7 7 3 Nett Decrease: 1 0 4 Signature from Cost Dept. that above is correct: GMRh 20.11.36. INITIAL | DATE | REMARKS SG. {Arthur F. Sidgreaves - MD} | 7-12-36 | Agreed SG. {Arthur F. Sidgreaves - MD} WOR. {Arthur Wormald - General Works Manager} Hs. {Lord Ernest Hives - Chair} | 27.11.36. | Agreed Hs. {Lord Ernest Hives - Chair} C. | 30.11.36. | Agreed C. E. {Mr Elliott - Chief Engineer} | 30.11.36. | Agreed-E. {Mr Elliott - Chief Engineer} DA. {Bernard Day - Chassis Design} | 1.12.36. | Agreed Da. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} | 1.12.36. | Agreed By. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} | 27.11.36. | Agreed, 10,000 miles test indicated as soon as possible. SFT. {Mr Swift} RHC {R. H. Coverley - Production Engineer} | 30.11.36.. | Agreed Sft. {Mr Swift} MX. {John H Maddocks - Chief Proving Officer} | 27.11.36. | Agreed Mx. {John H Maddocks - Chief Proving Officer} HSX Rm. {William Robotham - Chief Engineer} | 26.10.36. | Agreed Rm. {William Robotham - Chief Engineer} RHC {R. H. Coverley - Production Engineer} , Agreed 30.11.36. Stamp: J.S. 7 DEC 1936 | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
