From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Requisition for work on a test bed, including a blower installation and a rig to test water pumps and fans.
Identifier | ExFiles\Box 143\1\ scan0361 | |
Date | 17th April 1939 | |
R.R. 158 (100p) (28.4.38) G.C.B. REQUISITION TO EQUIPMENT DEPARTMENT 13/5 REQ. No. B 3807 / DEPT. No. R.R. M/c No. ORDER No. Date Issued 17/4/39. Date Begun This Requisition is to be used for work estimated to cost over 30/- and under £50. The above Numbers must be entered. Work Required NO.2 BED. Instruct necessary parts for blower installation on B.T.H. motor to be fitted up in No.2 bed. Parts to be as used on Aero Single Cylinder job. A rig to test water pumps and fans on the lines of the attached sketches should be schemed and instructed for the other end of the motor. Rm{William Robotham - Chief Engineer}/Ed.{J. L. Edwards} Equipment Dept. Approval NO/Overtime to be worked on this Job. Estimate to be filled in before work leaves Equipment Dept. COST. ESTIMATED ACTUAL ESTIMATE APPROVED. Labour Material Total Supervisor or Works Manager Millwright Signature: W A Robotham (Foreman) Approved (Supervisor if work is under £10) (Works Manager if over £10) Foreman Millwright | ||