Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The processing time for standardisation sheets, comparing the Magneto and the new 20 HP Camshaft.

Identifier  ExFiles\Box 29\2\  Scan090
Date  22th November 1923
  
BJ/Py. from Hs.{Lord Ernest Hives - Chair}

Y3066

Hs{Lord Ernest Hives - Chair}2/LG22.11.23.

STANDARDISATION SHEETS.

With reference to the attached ref. BJ/Py10/D21.11.23.

The std. sheet for the Magneto was sent to London on the 11th. inst. and was returned on the 17th. inst., and the completed sheets were sent out on the same day.

The delay of this std. sheet in London was about the average, for instance, in the case of the new 20 HP. Camshaft - the std.sheet for this was sent to London on the 9.10.23 and it was returned to us on the 5.11.23
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙