Requesting the modification of a U.S.A. auto switch using a new series Eureka winding.


Identifier  ExFiles\Box 59\1\  Scan286
Date  29th February 1928
  
X4008
To BY. {R.W. Bailey - Chief Engineer} from EFC. {E. Fowler Clarke - Electrical Engineer}
c. BY {R.W. Bailey - Chief Engineer} /RD.
c. RHC. {R. H. Coverley - Production Engineer}

EFCL/T29.2.28.

U.S.A. AUTO SWITCH.

In view of the fact that considerable reduction of variation of operating voltage due to temperature change will certainly be effected by the proposal of putting a series Eureka winding in the space at present used for packing on the other bobbin, I have asked Mr. Nadin if he will agree to the U.S.A. auto switch being delayed while we effect a similar improvement in this instrument for U.S.A. To this he has agreed.

For this purpose, therefore, we require a shunt coil bobbin instructing wound with 28 SWG. D.S.C. in a similar way to those already specially wound with 34 and 32 SWG. The 32 SWG. wound bobbin which we remove from the U.S.A. switch will be available as a second bobbin for the compensating switch for our own 12-volt working.

We should be pleased if you would instruct such a 28 SWG. wound bobbin at the earliest possible moment as we have told Mr. Nadin that this will not mean a further delay of much more than a fortnight.

EFC. {E. Fowler Clarke - Electrical Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙