Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Progress report on experimental work for a fortnight.

Identifier  ExFiles\Box 76\2\  scan0225
Date  16th October 1920
  
PROGRESS OF EXPERIMENTAL WORK.
FORTNIGHT ENDING 16.10.20.

DESIGNS RECEIVED FROM W.W.
Lec. 1885. Arrangement of valve mechanism. Vulture.
" 1286. Front door on driver's side. 6 "X.
" 1287. Windscreen. "
" 1288. Fan and bracket. Buzzard.

DESIGN WORK CARRIED OUT AT DERBY.
Oil separator for oil pump. 40/50. A.C.
Mechanical tyre pumps. "
Starting handle. "
Modification to spare wheel carrier. "
Impulse starters. "
Towing hooks (front & rear). "
Hand starting gear. "

Gauge lamp. 40/50.
Proposed priming device. "
Main switch for series connection. "
Modification to carburetter to take filter. "
(float chamber). "
Smith dynamo for 3/16 chassis. "
Battery box. "

Radiator. Goshawk.
Position of steering box in frame. "
Side steering tube. "

EXPERIMENTAL PARTS ISSUED BY PRODUCTION D.O.
Modification to condenser casing. N.Scheme 558.
Completed. 40/50.
Free-wheel arrangement for gear box. N.Scheme516.
Side filler for petrol tank. N.Scheme 538.
Completed. "
R.R. Distribution board. - Lec.1277
and Scheme N.563. "
Battery and fittings - Lec. 1173. "
Earth wiring. N.Schemes 380 - 507/8. "
R.R. Switchboard N. Scheme 576. "

(Contd).
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙