Standardisation of a 48 coil armature dynamo of medium output, without pole piece modification.
| Identifier | ExFiles\Box 62\3\ scan0153 | |
| Date | 19th January 1931 | |
| RR 788 (10M) (3-7-30) BM. 6/2571. X6004 COMPLETED 30.1.31. STANDARDISATION of CHASSIS PARTS. Date: 19.1.31. X No. 6004. Drawing No. Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Description of Parts. 48 COIL ARMATURE DYNAMO OF MEDIUM OUTPUT i.e. WITHOUT POLE PIECE MODIFICATION. (IN CONJUNCTION WITH TWO-RATE OUTPUT SWITCHING SCHEME). Origin. Necessity of reverting to earlier cutting in than is provided for by the 48 coil high output dynamo recently standardised. Experimental Test Report. A machine of this type has been prepared, having been given a brush setting for largest possible output consistently with the fact that the machine is to be used with the two-rate output switching scheme. This machine has been fitted to Sg {Arthur F. Sidgreaves - MD} 's car 58-GN and on preliminary test at Derby operated satisfactorily. Road Test Report. Not yet available. Weight of Old Part. Cost of Old Part. £0-6-0 Weight of New Part. Cost of New Part. £0-6-0 Difference per Car. Difference per Car. £ none Signature from Cost Dept. that above is correct. GRU 24/3/31 429727 Cost of Parts in Works which will be scrapped if commenced on :- Series.........£......... Series.........£......... Series.........£......... INITIAL | DATE | REMARKS SG. {Arthur F. Sidgreaves - MD} | 27-3-31 | Agreed SG. {Arthur F. Sidgreaves - MD} R. {Sir Henry Royce} | 2.2.31 | Agreed FHR. but I think that we are making very poor progress on this work, seem to be doing much spending money and getting no results towards maintaining output at higher speed. (EFC. {E. Fowler Clarke - Electrical Engineer} is responsible). WOR. {Arthur Wormald - General Works Manager} | 19.2.31 | Agreed WOR. {Arthur Wormald - General Works Manager} C. | 13.1.31 | Agreed C. RG. {Mr Rowledge} | 16.1.31 | Agreed Rg. {Mr Rowledge} DA. {Bernard Day - Chassis Design} | 15.1.31 | Agreed Da. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} | 13.1.31 | Agreed BY. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} | 13.1.31 | Agreed. Require road test experience. EP. {G. Eric Platford - Chief Quality Engineer} E. {Mr Elliott - Chief Engineer} | 14.1.31 | Agreed AE. PN. {Mr Northey} | 27.1.31 | Agreed PN. {Mr Northey} HS. {Lord Ernest Hives - Chair} | | Agreed Hs. {Lord Ernest Hives - Chair} STAMP: Received. U.S. 26 MAR 1931. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
