Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Status update on the completion of six jobs related to the Phantom engine.

Identifier  ExFiles\Box 91\1\  scan0524
Date  1st October 1937
  
To HPS{Horace Percy Smith - Experimental Factory Mgr}/WSC.{W. S. Cassel} from Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}

Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}6/AP.1.10.37

Will you please let us know the position of the following Jobs and when they will be completed.

PHANTOM

(1) Assembly of Ph.III. No.14 unit including the modified bottom tappets LeC.5667.

(2) 4 sets of solid rocker gear complete as instructed in memo Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}1/AP.11.9.37.

(3) Set of Hall's big end bushes with S/ZNX. or V.C.M. bearing halves with special conn. rods to ICD.37.

(4) Assembly of Ph.III. No.12 in accordance with our memo Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}6/AP.11.8.37.

(5) Bushes for dynamo drive spindle in accordance with memo Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}16/MH.{M. Huckerby}30.8.37.

(6) Result of inspection of B.9. in accordance with Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}10/JH.28.8.37 and B.4. in accordance with Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}4/MH.{M. Huckerby}).9.37.

Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙