Standardisation of a Zenith petrol filter to prevent stoppage of jets.

Identifier  ExFiles\Box 172\1\  img107
Date  23th May 1927
  
RR 785 REVISED (10M) (DE 648 9-12-26) BM. 2/1167.
COMPLETED 11.6.27
STANDARDISATION of CHASSIS PARTS.
Date 23.5.27
Description of Parts. ZENITH PETROL FILTER.
X No. 3700
Origin. To prevent stoppage of jets complained of by customers.
Drawing No.
Part List
Experimental Test Report.
This was fitted to 10-G-111 and ran 10,000 miles in France.
Road Test Report.
A considerable amount of sand and fluff was collected in the filter. No stoppage of jets occurred during the test. We consider it worth fitting.
[X] A Scrap and replace at all costs, including Chassis already delivered to Customers.
[ ] B Scrap and replace on Chassis in Works.
[ ] C Scrap present stock and replace on all Chassis not yet handed to test.
[ ] D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Cost of Old Part. £ 1. 1d.
Cost of Parts in Works which will be scrapped if commenced on:-
Weight of New Part.
Cost of New Part. £ 17. 7d.
Series..........£.........
Difference per Car.
Difference per Car. £ 16. 6d. increase.
Series..........£.........
Series..........£.........
Signature from Cost Dept. that above is correct. My/Rb.{R. Bowen} 1.6.27.
STAMP: H.P. CHASSIS
INITIAL | DATE | REMARKS
BJ. | 10.6.27 | Agreed. B.Johnson.
R.{Sir Henry Royce} | 25/5/27 | Agreed FHR
WOR.{Arthur Wormald - General Works Manager} | 23.5.28 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 30.5.27 | Agreed. Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 26.5.27 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 25.5.27 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 24.5.27 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 25/5/27 | Agreed AE. the filter at present on the carburetter should be cancelled otherwise it will not receive attention.
PN.{Mr Northey} | |
CWB. | 27.5.27 | Agreed. CWB. Cannot increased cost of this fitting be compensated by suppression of existing float chamber filter.
HS.{Lord Ernest Hives - Chair} | 23.5.27 | Agreed. Hs.{Lord Ernest Hives - Chair}
  
  