Rolls-Royce Archives
         « Prev  Box Series  Next »        

Log of engineering changes and updates for the 40/50 HP Chassis during late 1931.


Identifier  ExFiles\Box 154a\3\  scan0035
Date  5th January 1932
  
-2- BY {R.W. Bailey - Chief Engineer} /Mtn/N.5.1.32 Cont'd. {John DeLooze - Company Secretary}

Date Issued. Stn.Sht. No. Title. Date completed. Series where brought in. Chassis. To test.

40/50 HP. Chassis.

22.9.31 X.7520 Connecting Links for Rear Hydraulics. 2.12.31 51 in 'N' Production.

22.9.31 X.7005 Diamond Engine Mounting. 2.12.31 51 in 'N' Production.

25.9.31 X.7350 Rear Axle - Lub: of Rear Brake Act: Shaft. 4.12.31 51 in 'N' Production.

15.10.31 X.6022 Boyce Electric Clock. 25.11.31 Not Decided.

22.9.31 X.7005 Torque Re-action Dampers. 30.12.31 51 in 'N' Production.

21.9.31 X.7005 Bottom water pipe from radiator to pump. 30.12.31 51 in 'N' Production.



BY {R.W. Bailey - Chief Engineer} /Mtn.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙