Chassis progress report detailing completed work and work in hand.

Identifier  ExFiles\Box 133\4\  scan0267
Date  28th July 1941
  
-2-
Ev.{Ivan Evernden - coachwork}8/JH.28.7.41.

Progress Report July 21st. 1941.
CHASSIS.

Work Completed.
PL.760. Torque reaction box on steering box mounting. Myth.
PL.752 Perspective views of instrument board. "
PL.711 Austin 8 gearbox. Copy drawing.
PL.712 Morris 8 Gearbox. "
PL.717 Back axle gears. Senior Range.
PL.757 Valve timing diagram for Halford Hydraulic tappets. " "
PL.761 Lightened Gudgeon Pin 75 m.m. bore. " "
PL.766 Duralumin tappet push rod. B.80 " "

Work in Hand.
PL.669. Exhaust system (1/4 scale layout) Myth 90%
PL.686 B.W.S. Hydraulic Jack & Lifting Tube " 80%
PL.674 Wider A/DC front brake shoes and A/DC drum and hub. (Senior R) 90%

Alum connecting rod. (Senior R) In hand.
Twin drive for speedo and Tecalemit pump (morris G/Box) (Alum engine) In hand.
Radiator monogram. Myth In hand.
Painting of instrument board with R.R. type instruments. Myth In hand.
Side lamps in front wings (B.V. type) Myth In hand.

.........
  
  