Confirming the decision to redesign the Wraith III Front Hub due to manufacturing difficulties with die-casting.
| Identifier | ExFiles\Box 10\4\ 04-page15 | |
| Date | 9th April 1937 | |
| To R {Sir Henry Royce} /Ev. {Ivan Evernden - coachwork} From RHC. {R. H. Coverley - Production Engineer} c. to BL. c. to Hm. {Capt. W. Hallam - Head Repairs} c. to HPS. {Horace Percy Smith - Experimental Factory Mgr} c. to Rm {William Robotham - Chief Engineer} /Les. c. to R {Sir Henry Royce} /Pan. 636 RHC. {R. H. Coverley - Production Engineer} 8/MJ.9.4.37. WRAITH III FRONT HUB. Referring to R {Sir Henry Royce} /Ev. {Ivan Evernden - coachwork} 1/WH.19.3.37, we have taken this matter up with Mr. Wheeler and it is considered there would be great difficulty in maintaining the limits specified on the drawing in a die casting. It would also be a difficult piece to machine and assemble. We have since taken this up with the Design Dept., and they have agreed to re-design this piece. RHC. {R. H. Coverley - Production Engineer} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
