Confirming the decision to redesign the Wraith III Front Hub due to manufacturing difficulties with die-casting.


Identifier  ExFiles\Box 10\4\  04-page15
Date  9th April 1937
  
To R {Sir Henry Royce} /Ev. {Ivan Evernden - coachwork} From RHC. {R. H. Coverley - Production Engineer}
c. to BL.
c. to Hm. {Capt. W. Hallam - Head Repairs}
c. to HPS. {Horace Percy Smith - Experimental Factory Mgr}
c. to Rm {William Robotham - Chief Engineer} /Les.
c. to R {Sir Henry Royce} /Pan.

636

RHC. {R. H. Coverley - Production Engineer} 8/MJ.9.4.37.

WRAITH III FRONT HUB.

Referring to R {Sir Henry Royce} /Ev. {Ivan Evernden - coachwork} 1/WH.19.3.37, we have taken this matter up with Mr. Wheeler and it is considered there would be great difficulty in maintaining the limits specified on the drawing in a die casting. It would also be a difficult piece to machine and assemble.

We have since taken this up with the Design Dept., and they have agreed to re-design this piece.

RHC. {R. H. Coverley - Production Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙