Rolls-Royce Archives
         « Prev  Box Series  Next »        

Delaying the fitment of an unsatisfactory foot switch for Chassis 6.B.IV and 35-EX.


Identifier  ExFiles\Box 168a\2\  img261
Date  17th December 1936
  
To HPS. {Horace Percy Smith - Experimental Factory Mgr} from Rm {William Robotham - Chief Engineer} /Wst.

86139.

Rm {William Robotham - Chief Engineer} /Wst.2/AP.17.12.36.

Will you please note that owing to the unsatisfactory nature of the foot switch asked to be fitted to Chassis 6.B.IV. and 35-EX. will you please arrange for the standard switches to be left on the chassis until such times as the new switches are right.

Rm {William Robotham - Chief Engineer} /Wst.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙