Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Results of endurance and failure tests on various pivot types under different conditions.

Identifier  ExFiles\Box 2\12\  B002_X168-page218
Date  7th January 1914
  
ROLLS-ROYCE LIMITED,
NIGHTINGALE ROAD,
DERBY.
TELEGRAMS: "ROYCAR," DERBY.
TELEPHONES: 476 (Four Lines).

Names and Indicating letter.
A Mr. ADAMS
By Mr. BAILEY
Ba Mr. BARRINGTON
B Mr. BEREND
Bt{Capt. J. S. Burt - Engineer} Mr. BURT
C Mr. CHAMBERLAIN
Co Mr. COWEN
Cx{Major Len W. Cox - Advertising Manager} Mr. COX
D Mr. DALOOZE
Da{Bernard Day - Chassis Design} Mr. DAY
E Mr. ELLIOTT
F Mr. FRIESE
G Mr. GNAPP
Hy{Tom Haldenby - Plant Engineer} Mr. HALDENBY
Hm{Capt. W. Hallam - Head Repairs} Mr. HALLAM
H Mr. HANBURY
J Mr. JOHNSON
JS{Mr Johnson's Secretary} Mr. JOHNSON'S Secretary
K Mr. KILNER
Mac{Mr Macintosh} Mr. MACINTOSH
M Mr. MOON
Na{Mr Nadin} Mr. NADIN
PN{Mr Northey} Mr. NORTHEY
O Mr. OLDHAM
Pa{Mr Paterson} Mr. PATERSON
EP{G. Eric Platford - Chief Quality Engineer} Mr. PLATFORD
Ro{C. C. Rose - Export Manager} Mr. ROBINSON
R Mr. ROYCE
RS{Sir Henry Royce's Secretary} Mr. ROYCE'S Secretary
JR{Mr James Royce} Mr. JAMES ROYCE
Sn{Mr Sanderson} Mr. SANDERSON
LHS{Lord Herbert Scott} LORD HERBERT SCOTT
S Mr. SPINNEY
V VIENNA
Wa{Mr Wallis} Mr. WALLIS
Whr{Mr Wheeler} Mr. WHEELER
Wd{Mr Wood/Mr Whitehead} Mr. WHITEHEAD
Wor{Arthur Wormald - General Works Manager} Mr. WORMALD

Initial of person addressed: Wor.{Arthur Wormald - General Works Manager} Hy.{Tom Haldenby - Plant Engineer}

7.1.14. DaS/06114 Contd.

In another test over obstacles (Wor{Arthur Wormald - General Works Manager}/Hy{Tom Haldenby - Plant Engineer}1/L5713) and F.3372 type pivot ran for 1810 minutes and was not even out of truth at the conclusion.

In a frame bumping test (Wor{Arthur Wormald - General Works Manager}/Hy{Tom Haldenby - Plant Engineer}5/C201113) and F.3253 type pivot cracked in the U section after 12 hours 37 mins.

In other frame bumping tests (Wor{Arthur Wormald - General Works Manager}/Hy{Tom Haldenby - Plant Engineer}23 M1111213 and Wor{Arthur Wormald - General Works Manager}/Hy{Tom Haldenby - Plant Engineer}3/L271113) F.3372 type pivots broke in the stub at 7 hrs. 57 mins. and 6 hrs. 3 mins. respectively. In another report (Wor{Arthur Wormald - General Works Manager}/Hy{Tom Haldenby - Plant Engineer}5 L51213) pivots F.3697/8 broke in 12 hrs. 27 mins. and 15 hrs. 32 mins. respectively.

Da.{Bernard Day - Chassis Design}

This sheet must be filed with the correspondence to which it refers.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙