From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Confidential memo regarding chassis specifications, production proposals, and manufacturing during wartime.

Identifier  ExFiles\Box 153\3\  scan0232
Date  23th December 1943
  
1298
Chassis
Confidential.
To: Sg.{Arthur F. Sidgreaves - MD} from Rm.{William Robotham - Chief Engineer}
Rm.{William Robotham - Chief Engineer} 1/h.{Arthur M. Hanbury - Head Complaints} 23.12.43.
c. to M/Ls.

Replying to Sg.{Arthur F. Sidgreaves - MD} 15/KW. 21.12.43.
although we have made tentative proposals as to which chassis shall be put into production, it is left to me to finalise specifications which have to fit in with those of the 16 h.p.

When the rationalised programme was conceived it did not cover anything smaller than 3 1/2 litres.

I am already finding that minor alterations to the proposed models are desirable in the interests of commonisation. Ultimately, a brochure will be issued indicating exactly our recommendations.

With regard to the possibility of getting the price of the car down, this has been receiving continuous consideration but the conclusions drawn can obviously be of no value until they have been supplemented by the Works Manager after he has had time to plan the manufacture of the chassis in the quantities proposed to the finalised specification. It is clear that there will be almost insuperable problems in doing this in war-time.

Rm.{William Robotham - Chief Engineer}
(Transcribed in the absence of Mr. Robotham.)
  
  