From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation proposal for a carburetter air inlet to reduce noise.
Identifier | ExFiles\Box 172\1\ img058 | |
Date | 29th April 1924 | |
RR 755 (10M) (SL391 2-11-23) MP 281297 COMPLETED 22.5.24. STANDARDISATION of CHASSIS PARTS. Date 29.4.24 X No. 4228 Drawing No. Part List Description of Parts. CARBURETTER AIR INLET. Origin. To reduce noise. Experimental Test Report. With present carburetter and air inlet, there is are periods of noise caused by the air entering the carburetter which is amplified by the present air inlet. The proposed new air inlet does not reduce the performance in any way. Road Test Report. Run 3850 miles on 6-G-11. Run 2600 miles on 4-G-11. No trouble - engine is noticeably more quiet. A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £ 6. s. 0 d.{John DeLooze - Company Secretary} Weight of New Part. Cost of New Part. £ 15. s. 3 d.{John DeLooze - Company Secretary} Difference per Car. Difference per Car. £ 9. s. 3 d.{John DeLooze - Company Secretary} increase. Cost of Parts in Works which will be scrapped if commenced on:- Series..........£.......... Series..........£.......... Series..........£.......... Signature of Mr. De LOOZE that above is correct. My/Rns. 7.5.24. SIGNATURES | DATE | REMARKS MR. JOHNSON | 22.5.24 | Agreed. | C. Johnson. MR. B. JOHNSON | 22.5.24 | Agreed. | B.J. MR. ROYCE | 8/5/24 | Agreed FHR MR. WORMALD | 6.5.24 | Agreed. | Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE | 1.5.24 | Agreed. | Rg.{Mr Rowledge} MR. DAY | 1.5.24 | Agreed. | Da.{Bernard Day - Chassis Design} MR. BAILEY | 29.4.24 | Agreed. | BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD | 29.4.24 | Agreed. | EP.{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT | 12.5.24 | Agreed. | E.{Mr Elliott - Chief Engineer} MR. NORTHEY | 30.4.24 | Agreed. | PN.{Mr Northey} MR. HIVES | 21.5.24 | Agreed. | E.{Mr Elliott - Chief Engineer} Hives. | ||