Bi-weekly progress report for the Chassis Section.
| Identifier | ExFiles\Box 133\4\ scan0289 | |
| Date | 25th March 1942 | |
| 1125 To Hp. from Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} Copy to Ev. {Ivan Evernden - coachwork} Rm {William Robotham - Chief Engineer} /SJH. Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} 7/SL.25.3.42. PROGRESS REPORT CHASSIS SECTION For the two weeks ending 23rd March, 1942. WORK COMPLETED. All the details for the large B.V. petrol tank have been completed and handed to Rm {William Robotham - Chief Engineer} /HH. for issue. WORK IN HAND. All the designs mentioned in memo Ev. {Ivan Evernden - coachwork} 9/JH.30.1.42 are still unfinished. The following extra design is in hand:- Clutch housing to adapt Austin 8 gearbox to the Myth engine. Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} | ||