Bi-weekly progress report for the Chassis Section.

Identifier  ExFiles\Box 133\4\  scan0289
Date  25th March 1942
  
1125
To Hp. from Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}
Copy to Ev.{Ivan Evernden - coachwork}
Rm{William Robotham - Chief Engineer}/SJH.

Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}7/SL.25.3.42.

PROGRESS REPORT

CHASSIS SECTION

For the two weeks ending 23rd March, 1942.

WORK COMPLETED.

All the details for the large B.V. petrol tank have been completed and handed to Rm{William Robotham - Chief Engineer}/HH. for issue.

WORK IN HAND.

All the designs mentioned in memo Ev.{Ivan Evernden - coachwork}9/JH.30.1.42 are still unfinished. The following extra design is in hand:-

Clutch housing to adapt Austin 8 gearbox to the Myth engine.

Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}
  
  