Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Blueprint detailing the specifications, dimensions, and air pressure testing procedure for a matrix tube.

Identifier  Morton\M19\  img162
Date  27th March 1930
  
R.R.774(200M)(99879-27-3-30) N & G LTD.
NO
OPERATION
MACHINE TOOL
TOOL NO
TUBES TO BE ANNEALED BY THE SUPPLIERS AGAINST SEASON CRACKING ONLY
.300 +.50 LENGTH OF TINNING
.250 +.25
ES1389
B 2151
C 2138
81186
.050 RAD INSIDE
7 1/2 M/M + 1/10 M/M
6 M/M
.007"
4.000
EACH TUBE TO BE TESTED TWICE & NOT BY THE SAME OPERATIVE, FIRST BEFORE BULGING, SECONDLY AFTER BULGING, BY AN AIR PRESSURE OF 15 LBS PER SQ INCH THE TUBE BEING IMMERSED IN WATER ON EACH TEST FOR A PERIOD OF NOT LESS THAN 5 SECONDS.
SCALE 2/1
HEAT TREAT BRINELL
TITLE MATRIX TUBE
MACHINE ALL OVER OR WHERE MARKED THUS
MATERIAL STANTON
SPEC N. No
REPLACE ALL COPIES TO
EXP WORKS
PATT.
FORGE
S.R.
R
AMERICA
COST
T.O.
D.O.
R.D.
T.D.
DRAWN
TRACED
CHECKED
APPROVED
LIMITS O.K.
DATE
USED ON 40/50
N. OFF 5250
SECTION
ROLLS-ROYCE LIMITED
PRINT ROOM
21 APR 30
DERBY
J.9125
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙