Rolls-Royce Archives
         « Prev  Box Series  Next »        

The proposed layout for the Wraith II frame, mentioning a change from spot welding to bolts in certain areas.


Identifier  ExFiles\Box 8\10\  10-page005
Date  10th March 1936
  
HS. {Lord Ernest Hives - Chair}
c. Hs {Lord Ernest Hives - Chair} /Rm. {William Robotham - Chief Engineer} RHC. {R. H. Coverley - Production Engineer} Sft. {Mr Swift}
X1044 627
Da. {Bernard Day - Chassis Design} 1/HP.10.3.36.
Wraith II Frame.
CRX
Herewith is a print of LeC.5018 - Layout of the proposed Wraith II Frame. It is intended to buy out the entire frame finished welded up.
The drawing is not quite complete, it being intended to substitute bolts for the spot welding at certain points where it will be difficult to get the spot welding tool in, but apart from this, which does not affect the general proposal, the drawing represents the proposed frame.
We should be glad to have your comments, if any, as soon as possible.
LeC.5018 herewith.
Da. {Bernard Day - Chassis Design}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙