From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation document for a strengthened exhaust valve (KE965) for a Bentley.
| Identifier | ExFiles\Box 88\4\ scan0193 | |
| Date | 14th December 1936 | |
| RR 755B (10H) 88620 12-8-35 W.H.K. 21800 COMPLETED 14.1.37. BENTLEY STANDARDISATION of PARTS. Date 14/12/36, 24.11.36 X No. 254 Drawing No. EB.2970 Description of Parts: STRENGTHENED EXHAUST VALVE (KE965) Origin: Occasional breakage on test. Report of Experimental Test. Several failures occurred on the test beds with original valve (EB.2799) at junction of radius in the stem. The neck has been strengthened in EB.2970 and has run 15,000 miles test on 6-B-IV also endurance on test beds. Is in line with strengthened valve which is standard on the 25/30. MATERIAL £ s. d.{John DeLooze - Company Secretary} LABOUR £ s. d.{John DeLooze - Company Secretary} CHARGES £ s. d.{John DeLooze - Company Secretary} TOTAL £ s. d.{John DeLooze - Company Secretary} Cost of Old Part - - - Cost of New Part - - - Nett Increase: NEGLIGIBLE Signature from Cost Dept. that above is correct. GM 7.12.36. INITIAL | DATE | REMARKS SG.{Arthur F. Sidgreaves - MD} | 18-1-36. | Agreed Sg.{Arthur F. Sidgreaves - MD} WOR.{Arthur Wormald - General Works Manager} Hs.{Lord Ernest Hives - Chair} | | Agreed Hs.{Lord Ernest Hives - Chair} C. | 22.12.36. | Agreed AC. E.{Mr Elliott - Chief Engineer} | 23.12.36. | Agreed E.{Mr Elliott - Chief Engineer} DA.{Bernard Day - Chassis Design} | 30.12.36. | Agreed Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} | 22.12.36. | Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} | 22.12.36. | Agreed EP.{G. Eric Platford - Chief Quality Engineer} SFT.{Mr Swift} | 23.12.36. | Agreed Sft.{Mr Swift} MX.{John H Maddocks - Chief Proving Officer} | 22.12.36. | Agreed Mx.{John H Maddocks - Chief Proving Officer} HS.{Lord Ernest Hives - Chair} Rm.{William Robotham - Chief Engineer} | 21.12.36. | Agreed Rm.{William Robotham - Chief Engineer} RHC.{R. H. Coverley - Production Engineer} | 29.12.36. | Agreed RHC{R. H. Coverley - Production Engineer} [STAMP: U.S. 13 JAN 1937] | ||
