Modification to fix poor slow running on the 25/30 model, requesting information on the cost before a general rollout.
| Identifier | ExFiles\Box 101\3\ scan0084 | |
| Date | 18th June 1937 | |
| 500 S/W {Sales / Derby Works} To Rm. {William Robotham - Chief Engineer} from Sg. {Arthur F. Sidgreaves - MD} Copy to Hd. {Mr Hayward / Mr Huddy} re Slow Running. 25/30. So far as I can find, a Depot Instruction Sheet has not yet been circulated regarding the modification to overcome the poor slow running. I do not know whether this is hung up with you or Hd. {Mr Hayward / Mr Huddy} but should be glad if it could be urged along. The benefit on my car is very considerable - in fact so much so that I am wondering whether we ought not to arrange for it to be done on all 25/30's that come in to Depots, but before making a decision, I should like to have some information as to the cost of the modification. Sg. {Arthur F. Sidgreaves - MD} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
