From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of the front brake cam operating shaft, lightened to reduce wear on bushes.
Identifier | ExFiles\Box 171\3\ img253 | |
Date | 23th April 1925 | |
RR 755 (10M) (SL391 2-11-23) MP 261297 [STAMP] ORIGINAL COMPLETED 11.5.25. STANDARDISATION of CHASSIS PARTS. Date 23.4.25. Description of Parts. FRONT BRAKE CAM OPERATING SHAFT. Origin. Lightened to reduce wear on bushes. X No. 8420 Drawing No. Part List Experimental Test Report. With the original type of front brake cam operating shaft it was found that excessive wear occurred on the bushes supporting the shaft. Road Test Report. Run 10,032 miles on 98-NK car. Examination shewed very little wear. A definite improvement. Run 5,400 miles on 93-NK. No signs of wear. [STAMP] A.P. CLASS A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis Weight of Old Part. Cost of Old Part. £ 2. 10. 0 Cost of Parts in Works which will be scrapped if commenced on:- Weight of New Part. Cost of New Part. £ 2. 13. 0 Difference per Car. Difference per Car. £ . 3. 0d increase. Series.......£....... Series.......£....... Series.......£....... Signature of Mr. De LOOZE that above is correct. My/Rns. 7.5.25. SIGNATURES | DATE | REMARKS MR. JOHNSON | 11.5.25 | Agreed. C.Johnson. MR. B. JOHNSON | 11.5.25 | Agreed. B.J. MR. ROYCE | 25/4/25 | Agreed FHR MR. WORMALD | 23.4.25 | Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE | 27.4.25 | Agreed. Rg.{Mr Rowledge} MR. DAY | 25.4.25 | Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY | 24.4.25 | Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD | 24.4.25 | Agreed. Suggest consideration be given for those which wear in customers hands. EP.{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT | 25/4/25 | Agreed AE. MR. NORTHEY | 24.4.25 | Agreed. PN.{Mr Northey} MR. HIVES | 8.5.25 | Agreed. E.Hives. | ||