Rolls-Royce Archives
         « Prev  Box Series  Next »        

The distribution of the specification for the production model Corniche 60.


Identifier  ExFiles\Box 153\3\  scan0103
Date  1st July 1940
  
1298'
To Rm {William Robotham - Chief Engineer} /HH.
c. to Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer}
c. to Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames}
Ev. {Ivan Evernden - coachwork} 7/JH.1.7.40.
re Specification Production Model
Corniche(Bentley streamline(Experimental Streamline Bentley B.23.A.E)d precursor to R Type Continental, never produced) 60
Attached herewith are 3 copies of the specification for the production model Corniche(Bentley streamline(Experimental Streamline Bentley B.23.A.E)d precursor to R Type Continental, never produced) 60 PL.266. 1 set of prints is for Oy., 1 for Ashby, and 1 for Rm {William Robotham - Chief Engineer} /HH.
This specification represents how we would build the production model Corniche(Bentley streamline(Experimental Streamline Bentley B.23.A.E)d precursor to R Type Continental, never produced) 60 for immediate manufacture and the specification is based on that of the production Ripplet and Production Bentley 6.
Ev. {Ivan Evernden - coachwork}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙