Chassis progress report for the two weeks ending in late February 1942.
Identifier | ExFiles\Box 133\4\ scan0287 | |
Date | 23th February 1942 | |
To Rm.{William Robotham - Chief Engineer} c. to EV.{Ivan Evernden - coachwork} c. to Rm{William Robotham - Chief Engineer}/MIH. File Cars 112S Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}5/KO.23.2.42. Chassis Progress Report. For the two weeks ending Feb. 23rd, 1942. Work Completed. PL.1283 Stone Guards for 23 gallon Petrol Tank. B.5. Except for the above no chassis design work has been done during the last fortnight. The work list is therefore as issued under cover of memo Ev.{Ivan Evernden - coachwork}9/JH.30.1.42. Mr. Allen is detailing the 23 gallon petrol tank for Rm{William Robotham - Chief Engineer}/MIH. and should be finished in a day or two. Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames} | ||