Instructions for testing and bedding the brushes of a dynamo.
Identifier | ExFiles\Box 70\4\ scan0062 | |
Date | 29th January 1926 guessed | |
-2- Contd. (e) The connections of the pigtail conductors are not in any way damaged. (f) The initial bedding of the brush shows partial contact reasonably well distributed over the working surface. (Preliminary bedding of brushes). (2) The insulation resistance of the machine should be taken and should not be less than 1 megohm. N.B. For the running tests of the dynamo there must be no armature end play. It may be necessary to insert washers between the temporary driving pulley end bearing so as to keep the armature up towards this bearing, i.e. in the position which it will have when fitted on the chassis. (3) Main bedding of brushes. The dynamo shall now, starting cold, be run on load at about 1100 r.p.m. charging a 12 volt battery of ample capacity and the condition of the brush bedding observed and improved from time to time, if necessary. This should continue until the working surface of each brush shews evidence of making contact across the whole thickness of the brush, (i.e. in the direction of the commutator circumference at some place of an axial distance not less than .050"). (4) Final bedding of brushes. With end cover removed the dynamo shall now be run on load at 1100 r.p.m. for 3 1/2 hours charging a 12-volt battery of ample capacity. This should render the brush bedding finally satisfactory. Contd. | ||