Cost estimation for new tools for the Phantom III 'D' series chassis production.

Identifier  ExFiles\Box 171\2\  img295
Date  2nd September 1935
  
PHANTOM III STANDARDISATION of PARTS.
Estimated cost of new tools £36.0.0.
Could be brought on to production at the 1st chassis in "D" series (without scrap).

Top Left Box:
Date: 2.9.35
Ref.: On X .000
124.0A.4

Cost Table Headers:
MATERIAL £ s d, LABOUR £ s d, CHARGES £ s d, TOTAL £ s d

Main Table:
INITIAL | DATE | REMARKS
SB{Mr Bull/Mr Bannister} | 13.9.35 | as design
SH | 13.9.35 | as design
O | 16.9.35 | as design
XJJK | 16.9.35 | as passed
AO | 16.9.35 | as passed
YB | 16.9.35 | as passed
BXY | 16.9.35 | as passed
DHR | 16.9.35 | COSTS 1000 OFF WILL BE £0.0.3d. and produced Ja.
XM | 22.9.35 | as passed
MR | 26.9.35 | as passed
  
  