Letter from Rubery, Owen & Co Ltd regarding a delay in completing a Raith Frame due to awaiting a battery box bracket.
| Identifier | ExFiles\Box 8\10\ 10-page075 | |
| Date | 5th April 1937 | |
| SPECIALISTS IN COMPLETE FACTORY BUILDINGS ON LISTS OF AND CONTRACTORS TO THE BRITISH ADMIRALTY, WAR OFFICE, AIR MINISTRY & CROWN AGENTS FOR THE COLONIES, INDIA(Production 20 HP. with 4-speed box and Front Wheel Brakes) OFFICE & PRINCIPAL BRITISH & FOREIGN RAILWAYS SIDINGS: L.M.&S.R. NEAREST PASSENGER STATION, DARLASTON, (L.M.&S.R.) 3/4 MILE [Handwritten top right: 2812] TELEPHONES: DARLASTON 130 (PTE BCH {F. H. Birchmore - Chassis Delivery Manager} EX) LONDON, HOLBORN 6306 & 7 BIRMINGHAM, CENTRAL 8134 & 5 COVENTRY: 2940 ALL COMMUNICATIONS TO COMPANY -- NOT TO INDIVIDUALS STRUCTURAL STEELWORK MOTOR VEHICLE CHASSIS FRAMES PRESSINGS ROAD WHEELS, PULLEYS, BRIGHT BOLTS & NUTS & BRIGHT DRAWN BARS, AIRCRAFT COMPONENTS STEEL SHELVING & BINS, CLOTHES LOCKERS, FILING CABINETS AND TUBULAR FURNITURE. RUBERY, OWEN & CO LTD, (DIRECTORS: A. {Mr Adams} G. {Mr Griffiths - Chief Accountant / Mr Gnapp} B. OWEN (CHAIRMAN & MANAGING), FLORENCE L. OWEN, E. {Mr Elliott - Chief Engineer} W. B. OWEN, G. {Mr Griffiths - Chief Accountant / Mr Gnapp} H. {Arthur M. Hanbury - Head Complaints} BUCKLEY, C. E. {Mr Elliott - Chief Engineer} PARTRIDGE) DARLASTON SOUTH STAFFS, ENGLAND TELEGRAMS & CABLEGRAMS: RUBEROWEN, DARLASTON RUBEROWEN, PHONE, LONDON RUBEROWEN, BIRMINGHAM SMART, COVENTRY, 2940 CODES: A B C 5TH EDITION, BENTLEYS, WESTERN UNION LONDON: IMPERIAL BUILDINGS 56, KINGSWAY, W.C.2 BIRMINGHAM: LOMBARD HOUSE GREAT CHARLES STREET COVENTRY: 10, QUEENS ROAD YOUR REFERENCE [Handwritten: 627] OUR REFERENCE RWL/ED. {J. L. Edwards} : M.F.DEPT. 5th April 1937. Messrs. Rolls-Royce Ltd., DERBY. Dear Sirs, For the attention of Mr. Smith, Experimental Dept. We beg to advise you that we are still awaiting Support Boss Battery Box Bracket FW.896 from your goodselves, for fitting to the fourth Raith Frame, and shall be obliged if you will let us have this by return, as we are anxious there shall be as little delay as possible in completion of this Frame. Yours faithfully, p.p. RUBERY, OWEN & CO. LTD., [Signature: Huinmott] Manager-Motor Frame Dept.. [Handwritten: Ruth] [Handwritten note left side:] Lole Sent E. {Mr Elliott - Chief Engineer} Today Certain H {Arthur M. Hanbury - Head Complaints} /H | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
