Standardisation of 'D' Type C.H.N.S. keyed type change gear shaft with a modified bush and spring.
| Identifier | ExFiles\Box 15\5\ Scan013 | |
| Date | 24th September 1926 | |
| RR 755 REVISED (10H) (DE 444 6-10-26) BM. COMPLETED 19.10.26 STANDARDISATION of CHASSIS PARTS. Date 24.9.26 Description of Parts. 'D' TYPE C.H.N.S. KEYED TYPE CHANGE GEAR SHAFT - MODIFIED BUSH AND SPRING. Origin. To prevent grit cutting bush and shaft causing change speed lever to bind. Experimental Test Report. Road Test Report. This improved design got over the binding effect when changing from 2nd. to 3rd. or direct gears. The binding was caused by wear of the bush and scoring of the shaft with grit etc. 10,000 miles in France fitted to 12-EX. The change speed lever was free from jamming throughout the test. There was no sign of cutting or scoring of the shaft due to grit etc. Weight of Old Part. Cost of Old Part. £ 18. 6d. Weight of New Part. Cost of New Part. £ 19. 6d. Difference per Car. Difference per Car. £ 1. 0d. increase. Signature from Cost Dept. that above is correct. My/Rb. {R. Bowen} X No. 7310 Drawing G.74927 No. G.74909/11 Part List 16 A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on :- Series..........£.......... Series..........£.......... Series..........£.......... INITIAL | DATE | REMARKS BJ. | 18-X-26 | agreed f R. {Sir Henry Royce} | 1.10.26 | Agreed. FHR. WOR. {Arthur Wormald - General Works Manager} | 27.9.26 | Agreed. Wor. {Arthur Wormald - General Works Manager} RG. {Mr Rowledge} | 27.9.26 | Agreed. Rg. {Mr Rowledge} DA. {Bernard Day - Chassis Design} | 2.10.26 | Agreed. Da. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} | 11.10.26 | Agreed. BY. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} | 27.9.26 | Agreed. EP. {G. Eric Platford - Chief Quality Engineer} E. {Mr Elliott - Chief Engineer} | 1.10.26 | Agreed. E. {Mr Elliott - Chief Engineer} PN. {Mr Northey} | 29.9.26 | Agreed. PN. {Mr Northey} CWB. | 25.9.26 | Agreed. CWB. HS. {Lord Ernest Hives - Chair} | 24.9.26 | Agreed. Hs. {Lord Ernest Hives - Chair} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
