Standardisation of a 48 coil armature dynamo of medium output without pole piece modification.


Identifier  ExFiles\Box 171\1\  img231
Date  10th January 1931
  
RR 78B (10M) (3-7-30) BM. 5/2571.
COMPLETED 30.1.31.
STANDARDISATION of CHASSIS PARTS. Date 10.1.31.
Description of Parts. 48 COIL ARMATURE DYNAMO OF MEDIUM OUTPUT i.e. WITHOUT POLE PIECE MODIFICATION
X No. 6004.
Origin. (IN CONJUNCTION WITH TWO-RATE OUTPUT SWITCHING SCHEME). Necessity of reverting to earlier cutting in than is provided for by the 48 coil higher output dynamo recently standardised.
Drawing
Part List
Experimental Test Report.
A machine of this type has been prepared, having been given a brush setting for largest possible output consistently with the fact that the machine is to be used with the two-rate output switching scheme. This machine has been fitted to Sg {Arthur F. Sidgreaves - MD} 's car 58-GN. and on preliminary test at Derby operated satisfactorily.
Road Test Report. Not yet available.
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Cost of Old Part. £ 6. 0d.
Cost of Parts in Works which will be scrapped if commenced on :-
Weight of New Part.
Cost of New Part. £ 6. 0d.
Series.........
Difference per Car.
Difference per Car. £ Nil.
Series.........
Series.........
Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 24.3.31. G.25.3.31.
Wor. {Arthur Wormald - General Works Manager}
INITIAL | DATE | REMARKS
SG. {Arthur F. Sidgreaves - MD} | 27.3.31. | Agreed Sg. {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 2/2/31 | Agreed. HR. but I think that we are making very slow progress with this work, seem to be doing much spending of money with no results towards maintaining output an the required speed. (E.C. & D.A. responsible)
WOR. {Arthur Wormald - General Works Manager} | 13.2.31. | Agreed Wor. {Arthur Wormald - General Works Manager}
C. | 13.1.31. | Agreed C.
RG. {Mr Rowledge} | 16.1.31. | Agreed Rg. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 15.1.31. | Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 13.1.31. | Agreed By. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 13.1.31. | Require road test experience. EP. {G. Eric Platford - Chief Quality Engineer}
E. {Mr Elliott - Chief Engineer} | 14.1.31. | Agreed AE.
PN. {Mr Northey} | 27.1.31. | Agreed PN. {Mr Northey}
HS. {Lord Ernest Hives - Chair} | | Agreed Hs. {Lord Ernest Hives - Chair}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙