Modification request to increase the life of a milling cutter, detailing cost and production availability.

Identifier  ExFiles\Box 171\2\  img354
Date  14th September 1938
  
PHANTOM III STANDARDISATION of PARTS
Estimated cost of new tools £14.0.0d.
Could be brought on production as soon as new milling cutters are available. (without scrap).
Modification requested by Works increases life of milling cutter from 150 to 200 rods. Each cutter costs £5. not £14. hence actual saving although not shown in factory cost is 1/7d. per set of conn. rods RHC.{R. H. Coverley - Production Engineer}
MATERIAL
LABOUR
CHARGES
TOTAL
INITIAL
DATE
REMARKS
S.C 14.11.38
HS{Lord Ernest Hives - Chair} 16.11.38
C 18.11.38
YB 19.11.38
AQ 21.11.38
RHC{R. H. Coverley - Production Engineer} 22.11.38
XM 26.11.38
RM{William Robotham - Chief Engineer} 30.11.38
  
  