Chassis progress report detailing completed work and work in hand.


Identifier  ExFiles\Box 133\4\  scan0282
Date  29th September 1941
  
-3-
Ev {Ivan Evernden - coachwork} /JD. {J. Draper - Frames} 10/JH.1.10.41.

Chassis Progress Report - Sept. 29th. 1941.

Work Completed.

X PL.836 Stiffened front brake carrier plate - Myth.
X PL.851 Cast iron hub - steering column head - Myth.
X PL.871 Aluminium hub - steering column head - Myth.

Work in hand.

X PL.669 Exhaust system (1/4 scale layout) Myth 90%
X PL.686 D.W.S. Hydraulic jack & lifting tube Myth 80%
X - Alum connecting rod - alum. engine S.R. in hand.
X - Front drive for speedo. & tecalemit
pump (Morris Gearbox) Myth in hand.
X - Radiator Monogram. Myth in hand.
X - Painting of instrument board. with
R.R. instruments. Myth in hand.
X PL.828 Front roll rod and revised steering
layout - Austin 8. Austin 8 in hand.
X PL.829 Spare wheel locker under boot floor 15.B.V. in hand.
x - Rear bumper & fixing. Myth in hand.


* * * * * * * * * *
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙